• Our company is EKOTEK, Trademark registered and controlled and audited by ISO 9001: 2015 quality management system.
• Module b (project) + module f (manufacturing) for each product is certified according to TSE Standard with CE certificate.
• Ultrasonic, radiographic and penetrating tests are carried out by our authorized company.
• Welding operations are carried out by certified welders in accordance with approved WPS and WPQR. Welding processes are subjected to radiographic testing at the rates stipulated by the standards. • The products used in production are all certified materials. • Our products are produced in accordance with 12953-2 Standard and 2014/68 / EU Pressure Vessels Directive and have CE certificate.
• Our products are manufactured according to EN288, EN287-1 using P 265 GH and P 355 GH quality boiler sheet. • Our products are manufactured using boiler pipes made of steel of higher quality, P235GH and TS EN 10217-2 norm.
• Boiler pipes are the pipes that have undergone normalization (strain relief annealing) annealing heat treatment.
• Products can burn fuels such as natural gas, lpg, lng, diesel, fuel oil, biogas. You can choose the burner brand according to your request.
• On request, economizer can be added to the flue gas outlet in order to benefit from the heat of the smoke gases. The economizer to be mounted on the back of the boiler allows the condensate entering the boiler to be heated and back into the boiler. and fuel economy.
• When choosing the boiler, annual, monthly, daily and hourly steam needs of the enterprise should be taken into consideration.
• GET SUPPORT FROM ENGINEERING COMPANIES FOR CENTRAL SYSTEM GAS OPENING WORKS. • DO NOT FORGET TO CONNECT THE BURNER PE MAX: 300 MBAR GAS LINE.
• DO NOT FORGET TO HAVE CE AND TSE CERTIFIED CHIMNEYS SUITABLE FOR NATURAL GAS. DON’T FORGET TO TAKE CHIMNEY OFFER SUITABLE FOR NATURAL GAS FROM OUR COMPANY.
• It has the flexibility to work compatible with different combustion systems.
• THE QUALITY OF THE STEAM BOILER IS QUALITY OF THE FEED WATER. When purchasing a steam boiler, its manufacturing quality, post-fabrication pressure tests and operational efficiency are emphasized. However, the lifetime of this boiler, its operational efficiency and the purity of the steam it produces is directly proportional to the purity of the water put into it rather than the manufacturing quality of the boiler. For this reason, it is necessary to act very knowledgeable in the preparation of the boiler feed water and the devices required for the preparation of the feed water should be selected very carefully and then operated with the same diligence. Most of the problems experienced in the operation of the boiler (boiler and condensate system) are related to the chemical quality of the water supplied to the boiler and called “feed water”. The problems of the operator who belittles the chemistry of the feed water and underestimate this feature never disappear. For feed water, get support from the treatment companies in your area and our company.